← Back to Poland Portfolio
HPC & AI Factory — Land Acquisition Site Analysis

Gliwice South 100–200 MW

A+ / near S-tier. UPGRADED: Thinx IX IN Gliwice + EPIX Katowice (3.5Tbps+, 850+ users, 20km) = dual-IX. Best fiber outside Warsaw. Consider combining with #7 for mega-campus.

Site ID#6
Overall TierA+
VoivodeshipŚląskie
Grid (DSO)Tauron
Coordinates50.2691°N, 18.5801°E
RecommendationPROCEED — High Priority, Combine with #7
Overall TierA+16-Factor Assessment
Power TierA100–200 MW
Fiber TierSAtman + EPIX
Composite3.8A — Weighted Score

Key Strengths

  • 🏆 DUAL IX: Thinx IN Gliwice + EPIX Katowice (3.5Tbps+, 850+ users, 20km) — S-tier fiber
  • 2M Upper Silesian metro area — S-tier workforce with Silesian University of Technology
  • A1/A4 motorway junction — best transport connectivity in Poland
  • KSSE (Katowicka) SEZ with active industrial zones
  • Consider combining with #7 (~4km apart) for 200-300MW mega-campus

Key Risks

  • Mining subsidence risk in Upper Silesia region
  • Urban constraints limit greenfield parcel sizes
  • Competing heavy industry demand for grid capacity
01

Power & Grid Infrastructure

WEIGHT: 25%
1
Power Availability
A
Dense Tauron HV grid. Multiple 110/220kV lines. Upper Silesia industrial grid strength.
2
HV Grid Proximity
A
110/220kV dense infrastructure in Upper Silesia. Among strongest grids in Poland.
02

Connectivity & Fiber

WEIGHT: 15%
3
Fiber / Connectivity
S
UPGRADED: Thinx IN Gliwice + EPIX Katowice 20km (3.5Tbps+, 850+ users). Dual-IX = equal to Warsaw.
4
Fiber Operators (Validated)
S
Orange, Exatel, Atman, Tauron OPGW. Thinx + EPIX dual-IX. Exceptional.
03

Land & Infrastructure

WEIGHT: 20%
5
Land & Expansion
B
Urban area — constrained parcel sizes. Some industrial brownfield available.
6
Transport Access
S
A1/A4 junction — best transport connectivity in Poland. Rail hub.
7
Zoning / Permitting
B
Industrial zoning likely in target areas. Standard DC permitting.
8
Scalability (>200MW)
C
Dense urban area limits mega-campus. Combine with #7 for scale.
04

Environment & Climate

WEIGHT: 15%
9
Water / Cooling
B
Adequate municipal supply. No major river directly adjacent.
10
Natural Disaster Risk
B
Mining subsidence risk in some areas. Requires geotech survey.
11
Climate / PUE
A
Southern Poland. Good PUE potential vs Western Europe.
05

Economic & Workforce

WEIGHT: 25%
12
Workforce & Talent
S
Silesian UT + 2M metro. Poland's largest urban agglomeration. Deep industrial talent.
13
SEZ / Tax Incentives
A
KSSE (Katowicka SSE) active. Polish Investment Zone eligible.
14
Political Support
B
No deep relationships yet. City interested in tech diversification from mining.
15
Market Proximity
A
DACH + CEE gateway. Upper Silesia industrial demand. Strong regional market.
16
Land Cost
C
Urban Silesian pricing. Premium vs rural sites.
06

Weighted Composite Score

Power & Grid — avg 4.00 × 0.251.00
Connectivity — avg 5.00 × 0.150.75
Land & Infrastructure — avg 3.25 × 0.200.65
Environment & Climate — avg 3.33 × 0.150.50
Economic & Regulatory — avg 3.60 × 0.250.90
COMPOSITE SCORE3.8 / 5.00 → A
07

16-Factor Scoring Matrix

#FactorTierScoreCategory
1Power AvailabilityA4Power & Grid
2HV Grid ProximityA4Power & Grid
Power & Grid Average4.00× 0.25 = 1.00
3Fiber / ConnectivityS5Connectivity
4Fiber Operators (Validated)S5Connectivity
Connectivity Average5.00× 0.15 = 0.75
5Land & ExpansionB3Land & Infrastructure
6Transport AccessS5Land & Infrastructure
7Zoning / PermittingB3Land & Infrastructure
8Scalability (>200MW)C2Land & Infrastructure
Land & Infrastructure Average3.25× 0.20 = 0.65
9Water / CoolingB3Environment & Climate
10Natural Disaster RiskB3Environment & Climate
11Climate / PUEA4Environment & Climate
Environment & Climate Average3.33× 0.15 = 0.50
12Workforce & TalentS5Economic & Regulatory
13SEZ / Tax IncentivesA4Economic & Regulatory
14Political SupportB3Economic & Regulatory
15Market ProximityA4Economic & Regulatory
16Land CostC2Economic & Regulatory
Economic & Regulatory Average3.60× 0.25 = 0.90
COMPOSITE TOTAL3.8A — PROCEED
08

Location Data

Coordinates50.2691°N, 18.5801°E
Google MapsOpen in Maps →
VoivodeshipŚląskie
Grid DSOTauron
Fiber PrimaryAtman + EPIX
Power ConfirmedTBD — Dense Tauron HV grid
09

CEE Portfolio Context

CountryTierCapacityStatus
🇵🇱PolandS2 GW+Phase 1 under construction. 20 sites assessed. Stargard (S-tier) primary.
🇷🇴RomaniaA369 MWAvram Iancu — 369MW PV+BESS co-location. Grid-connected. In planning.
🇧🇬BulgariaA1 GWIn planning. Kozloduy nuclear corridor. Strong grid.
🇨🇿Czech RepublicB+200 MWUp next. Prague metro + industrial zones. NIX.CZ IXP.
🇪🇪EstoniaB+100 MWUp next. Tallinn data hub. Cool climate. Nordic connectivity.
🇭🇺HungaryB150 MWBudapest metro. BIX IXP. Paks nuclear proximity. Evaluate.
🇱🇹LithuaniaB100 MWVilnius/Kaunas. LINX node. Baltic interconnection. Evaluate.
🇱🇻Latvia / SlovakiaB–50 MWEarly evaluation. Riga / Bratislava metro areas.
🇭🇷Croatia / SloveniaC50 MWEvaluate. Zagreb / Ljubljana. Limited grid. Emerging markets.
🇷🇸Serbia, BiH, OthersDMonitor only. Regulatory uncertainty. Grid instability.

Strategic Recommendation

PROCEED — High Priority, Combine with #7

A+ tier with S-tier fiber (dual-IX). Thinx IN Gliwice + EPIX Katowice 20km = best fiber outside Warsaw. Silesian UT + 2M metro = S-tier workforce. KSSE SEZ. Negotiate Tauron grid study. Consider combining with Site #7 (4km apart) for 200-300MW mega-campus.