HPC & AI Factory — Poland Site Portfolio

🇵🇱 Poland 2 GW+
20-Site Assessment

Complete 16-factor site analysis across 20 sites in 8 voivodeships. Harmonized scoring from Alterland and Bear Lake portfolios. NVIDIA Vera Rubin NVL144 · 160MW IT Load · Liquid Cooling.

20Sites Assessed
8Voivodeships
2 GW+Total Pipeline
SPrimary Tier
S S-TIER — EXECUTE (1 site)
Stargard Industrial Park S
★ Primary · Zachodniopomorskie
⚡ 480 MW → 1 GW+ 📍 53.34°N, 15.05°E
480MW ENEA phased power allocation (80+80+160+160MW) with PSE 1GW pending
A+ A+ TIER — HIGH PRIORITY (3 sites)
Gliwice South A+
#6 · Śląskie
⚡ 100–200 MW 📍 50.27°N, 18.58°E
🏆 DUAL IX: Thinx IN Gliwice + EPIX Katowice (3.5Tbps+, 850+ users, 20km) — S-tier fiber
Gliwice / Knurów A+
#7 · Śląskie
⚡ 100–200 MW 📍 50.23°N, 18.62°E
Identical S-tier fiber zone to #6 — dual-IX (Thinx + EPIX) access
W. Warsaw / Nadarzyn A+
#8 · Mazowieckie
⚡ 50–150 MW 📍 52.18°N, 20.76°E
🏆 ALL IXPs: PLIX, TPIX, Thinx, EPIX — Poland's undisputed #1 connectivity hub
A A-TIER — PROCEED (8 sites)
East Gdańsk A
#2 · Pomorskie
⚡ 50–100 MW 📍 54.33°N, 18.74°E
Thinx IX node IN Gdańsk — strong terrestrial fiber (corrected: no direct submarine landing)
S. Wrocław / Bielany A
#4 · Dolnośląskie
⚡ 50–100 MW 📍 51.08°N, 16.95°E
WRIX IX (5 DCs) + Thinx node — established data center ecosystem
Polkowice / KGHM A
#10 · Dolnośląskie
⚡ 200–500 MW 📍 51.57°N, 16.01°E
🔥 KGHM mine grid: 200-400MW on dedicated 110kV+ substations — S-tier power potential
Kobierzyce ⚡ Filip A
#11 · Dolnośląskie
⚡ 50 MW 📍 51.03°N, 16.87°E
⚡ POWERED+PERMITTED per Filip — 50MW ready (PENDING KOS confirmation)
Choczewo Plot 291 A
#12 · Pomorskie
⚡ 400–1,000+ MW 📍 54.76°N, 17.97°E
400kV PSE substation commissioning 2027 — connecting 1.7GW offshore wind
Choczewo Plot 109 A
#13 · Pomorskie
⚡ Campus with Plot 291 📍 54.76°N, 17.97°E
Same S-tier power zone as Plot 291 — shared 400kV substation access
Wrocław Miękinia A
#17 · Dolnośląskie
⚡ 100–200+ MW 📍 51.17°N, 16.69°E
400ha LSSE industrial park — fully serviced (roads, water, wastewater)
Konin A
#19 · Wielkopolskie
⚡ 200–500+ MW 📍 52.26°N, 18.27°E
ZE PAK power complex — modernized 220/110kV substation (2022, 26-bay GIS, 275 MVA transformers)
B+ B+ TIER — CONDITIONAL (3 sites)
Środa Śląska B+
#3 · Dolnośląskie
⚡ 30–80 MW 📍 51.04°N, 16.59°E
HAWE Telekom HQ in Legnica only 40km — dark fiber procurement advantage
Jawor B+
#9 · Dolnośląskie
⚡ 30–80 MW 📍 51.08°N, 16.17°E
HAWE Telekom HQ only 20km in Legnica — direct dark fiber procurement advantage
Szczecin Kołbaskowo B+
#14 · Zachodniopomorskie
⚡ 50–100 MW 📍 53.34°N, 14.43°E
German border location — A6/S3 highways to Berlin
B B-TIER — EVALUATE (3 sites)
NW Opole B
#1 · Opolskie
⚡ 50–100 MW 📍 50.80°N, 17.07°E
Elektrownia Opole (2×900MW + 2×900MW new units) provides substantial grid strength
Słupsk Grunwaldzka B
#15 · Pomorskie
⚡ 30–80 MW 📍 54.48°N, 16.99°E
Near submarine cable landing (BALTICA, Denmark-Poland 2) — Nordic connectivity potential
Wałbrzych B
#18 · Dolnośląskie
⚡ 30–80 MW 📍 50.81°N, 16.31°E
WSEZ INVEST-PARK — Poland's largest SEZ operator (2,212ha, 41 subzones)
C C-TIER — MONITOR / DROP (2 sites)
Żary C
#5 · Lubuskie
⚡ 20–50 MW 📍 51.53°N, 15.23°E
Cheap land — rural Lubuskie pricing
Słupsk Redzikowo C
#16 · Pomorskie
⚡ 20–50 MW 📍 54.46°N, 17.13°E
Cool Baltic climate — good PUE
CEE

CEE Strategic Context

CountryTierCapacityStatus
🇵🇱PolandS2 GW+Phase 1 under construction. 20 sites assessed. Stargard (S-tier) primary.
🇷🇴RomaniaA369 MWAvram Iancu — 369MW PV+BESS co-location. Grid-connected. In planning.
🇧🇬BulgariaA1 GWIn planning. Kozloduy nuclear corridor. Strong grid.
🇨🇿Czech RepublicB+200 MWUp next. Prague metro + industrial zones. NIX.CZ IXP.
🇪🇪EstoniaB+100 MWUp next. Tallinn data hub. Cool climate. Nordic connectivity.
🇭🇺HungaryB150 MWBudapest metro. BIX IXP. Paks nuclear proximity. Evaluate.
🇱🇹LithuaniaB100 MWVilnius/Kaunas. LINX node. Baltic interconnection. Evaluate.
🇱🇻Latvia / SlovakiaB–50 MWEarly evaluation. Riga / Bratislava metro areas.
🇭🇷Croatia / SloveniaC50 MWEvaluate. Zagreb / Ljubljana. Limited grid. Emerging markets.
🇷🇸Serbia, BiH, OthersDMonitor only. Regulatory uncertainty. Grid instability.