HPC & AI Factory — Land Acquisition Site Analysis

Jawor 30–80 MW

B+ UPGRADED. HAWE Telekom HQ only 20km in Legnica! Direct dark fiber procurement. Panattoni Park + CTPark Legnica nearby. LSSE SEZ. Lower cost alternative to Wrocław.

Site ID#9
Overall TierB+
VoivodeshipDolnośląskie
Grid (DSO)Tauron
Coordinates51.0839°N, 16.1695°E
RecommendationCONDITIONAL — HAWE Fiber Quote + Grid Study
Overall TierB+16-Factor Assessment
Power TierC30–80 MW
Fiber TierB+HAWE (HQ 20km!)
Composite3.15B+ — Weighted Score

Key Strengths

  • HAWE Telekom HQ only 20km in Legnica — direct dark fiber procurement advantage
  • Panattoni Park + CTPark Legnica nearby — confirmed industrial infrastructure
  • LSSE SEZ with active incentives
  • Cheap land — well below Wrocław pricing

Key Risks

  • Weak grid — needs KOS study, no confirmed HV substation capacity
  • Rural workforce — limited local talent, dependent on Legnica/Wrocław
  • WRIX Wrocław ~65km — not adjacent to IXP
01

Power & Grid Infrastructure

WEIGHT: 25%
1
Power Availability
C
Near Legnica. Some transformer infrastructure nearby. LSSE zone. Needs grid assessment.
2
HV Grid Proximity
B
Some HV infrastructure in Legnica corridor. Not confirmed for DC scale.
02

Connectivity & Fiber

WEIGHT: 15%
3
Fiber / Connectivity
B+
UPGRADED: HAWE HQ Legnica 20km. Direct dark fiber. Panattoni+CTPark confirmed. WRIX 65km.
4
Fiber Operators (Validated)
B+
HAWE HQ 20km! Orange, Tauron OPGW. Dark fiber procurement advantage.
03

Land & Infrastructure

WEIGHT: 20%
5
Land & Expansion
A
Rural Lower Silesia. Large cheap plots available. Expansion-friendly.
6
Transport Access
B
A4 motorway accessible. Local road network adequate. Rail via Legnica.
7
Zoning / Permitting
C
Agricultural conversion likely needed. 6-18 month timeline.
8
Scalability (>200MW)
B
Land available but grid limits scale without major investment.
04

Environment & Climate

WEIGHT: 15%
9
Water / Cooling
A
Kaczawa River system. Adequate water resources.
10
Natural Disaster Risk
B
Generally low risk. Not in major flood zone. No mining subsidence.
11
Climate / PUE
A
Lower Silesian climate. Good PUE potential.
05

Economic & Workforce

WEIGHT: 25%
12
Workforce & Talent
C
Rural area. Legnica (~100K) and Wrocław (~65km) provide talent but commute required.
13
SEZ / Tax Incentives
A
LSSE (Legnicka SSE) active. Polish Investment Zone eligible.
14
Political Support
C
No established relationships. Rural municipality.
15
Market Proximity
A
DACH corridor via A4. Wrocław metro proximity.
16
Land Cost
S
Rural Lower Silesia <€10-20/sqm. Among cheapest in portfolio.
06

Weighted Composite Score

Power & Grid — avg 2.50 × 0.250.62
Connectivity — avg 3.50 × 0.150.53
Land & Infrastructure — avg 3.00 × 0.200.60
Environment & Climate — avg 3.67 × 0.150.55
Economic & Regulatory — avg 3.40 × 0.250.85
COMPOSITE SCORE3.15 / 5.00 → B+
07

16-Factor Scoring Matrix

#FactorTierScoreCategory
1Power AvailabilityC2Power & Grid
2HV Grid ProximityB3Power & Grid
Power & Grid Average2.50× 0.25 = 0.62
3Fiber / ConnectivityB+3.5Connectivity
4Fiber Operators (Validated)B+3.5Connectivity
Connectivity Average3.50× 0.15 = 0.53
5Land & ExpansionA4Land & Infrastructure
6Transport AccessB3Land & Infrastructure
7Zoning / PermittingC2Land & Infrastructure
8Scalability (>200MW)B3Land & Infrastructure
Land & Infrastructure Average3.00× 0.20 = 0.60
9Water / CoolingA4Environment & Climate
10Natural Disaster RiskB3Environment & Climate
11Climate / PUEA4Environment & Climate
Environment & Climate Average3.67× 0.15 = 0.55
12Workforce & TalentC2Economic & Regulatory
13SEZ / Tax IncentivesA4Economic & Regulatory
14Political SupportC2Economic & Regulatory
15Market ProximityA4Economic & Regulatory
16Land CostS5Economic & Regulatory
Economic & Regulatory Average3.40× 0.25 = 0.85
COMPOSITE TOTAL3.15B+ — CONDITIONAL
08

Location Data

Coordinates51.0839°N, 16.1695°E
Google MapsOpen in Maps →
VoivodeshipDolnośląskie
Grid DSOTauron
Fiber PrimaryHAWE (HQ 20km!)
Power ConfirmedTBD — Needs grid assessment
09

CEE Portfolio Context

CountryTierCapacityStatus
🇵🇱PolandS2 GW+Phase 1 under construction. 20 sites assessed. Stargard (S-tier) primary.
🇷🇴RomaniaA369 MWAvram Iancu — 369MW PV+BESS co-location. Grid-connected. In planning.
🇧🇬BulgariaA1 GWIn planning. Kozloduy nuclear corridor. Strong grid.
🇨🇿Czech RepublicB+200 MWUp next. Prague metro + industrial zones. NIX.CZ IXP.
🇪🇪EstoniaB+100 MWUp next. Tallinn data hub. Cool climate. Nordic connectivity.
🇭🇺HungaryB150 MWBudapest metro. BIX IXP. Paks nuclear proximity. Evaluate.
🇱🇹LithuaniaB100 MWVilnius/Kaunas. LINX node. Baltic interconnection. Evaluate.
🇱🇻Latvia / SlovakiaB–50 MWEarly evaluation. Riga / Bratislava metro areas.
🇭🇷Croatia / SloveniaC50 MWEvaluate. Zagreb / Ljubljana. Limited grid. Emerging markets.
🇷🇸Serbia, BiH, OthersDMonitor only. Regulatory uncertainty. Grid instability.

Strategic Recommendation

CONDITIONAL — HAWE Fiber Quote + Grid Study

B+ upgraded by HAWE HQ proximity (20km Legnica). Direct dark fiber procurement feasible. Panattoni Park and CTPark Legnica confirm industrial infrastructure. LSSE SEZ. Needs Tauron KOS grid study (weak grid suspected). If grid passes → strong lower-cost alternative to Wrocław metro sites.