← Back to Poland Portfolio
HPC & AI Factory — Land Acquisition Site Analysis

Wrocław Miękinia 100–200+ MW

A-tier MAJOR OPPORTUNITY. 400ha LSSE park, fully serviced — originally Intel's $4.6B fab site (cancelled). 245M PLN infrastructure invested. Wrocław metro workforce. WRIX+Thinx <25km.

Site ID#17
Overall TierA
VoivodeshipDolnośląskie
Grid (DSO)Tauron
Coordinates51.167883°N, 16.685197°E
RecommendationPROCEED — Critical Opportunity (Ex-Intel Site)
Overall TierA16-Factor Assessment
Power TierB+100–200+ MW
Fiber TierAHAWE + Atman
Composite3.98A — Weighted Score

Key Strengths

  • 400ha LSSE industrial park — fully serviced (roads, water, wastewater)
  • Ex-Intel $4.6B fab site — 245M PLN infrastructure already built by municipality
  • Wrocław metro S-tier workforce (640K city)
  • WRIX + Thinx <25km — excellent fiber (same zone as Bielany/Kobierzyce)
  • Aggressive municipality likely to offer very favorable terms

Key Risks

  • Grid capacity post-Intel withdrawal TBD — may not have been fully built out
  • Odra basin flood risk — requires assessment
  • Ex-Intel site may attract competing bidders
01

Power & Grid Infrastructure

WEIGHT: 25%
1
Power Availability
B+
Intel fab planned for high-power manufacturing — implies significant Tauron grid preparation. Need confirmation.
2
HV Grid Proximity
B+
400ha serviced park likely has HV infrastructure. Need to confirm what was built pre-Intel cancellation.
02

Connectivity & Fiber

WEIGHT: 15%
3
Fiber / Connectivity
A
Same Wrocław metro zone as #4 and #11. WRIX (5 DCs) + Thinx within 20-25km. HAWE backbone nearby.
4
Fiber Operators (Validated)
A
HAWE (~55km), Atman, Orange, Exatel. Wrocław metro fiber reachable.
03

Land & Infrastructure

WEIGHT: 20%
5
Land & Expansion
S
400ha fully serviced park. Roads, water, wastewater built. 245M PLN invested by municipality.
6
Transport Access
A
A4 corridor access. Wrocław metro proximity. Good logistics.
7
Zoning / Permitting
A
Industrial park — zoning already in place for large-scale manufacturing/tech.
8
Scalability (>200MW)
S
400ha park — room for multi-GW campus if grid supports. Fully serviced.
04

Environment & Climate

WEIGHT: 15%
9
Water / Cooling
A
Fully serviced park includes water/wastewater infrastructure.
10
Natural Disaster Risk
C
Odra basin flood risk. Requires detailed flood map analysis and elevation survey.
11
Climate / PUE
A
Lower Silesian climate. Good PUE conditions.
05

Economic & Workforce

WEIGHT: 25%
12
Workforce & Talent
S
Wrocław metro 640K. PWr university. Poland's #3 tech hub.
13
SEZ / Tax Incentives
S
LSSE zone active with infrastructure investment. Municipal incentives for replacement tenant.
14
Political Support
A
Municipality invested 245M PLN. Desperate for replacement tenant. Highly supportive.
15
Market Proximity
A
Wrocław metro. DACH corridor. Growing DC market.
16
Land Cost
A
LSSE park pricing. Likely favorable terms from motivated municipality.
06

Weighted Composite Score

Power & Grid — avg 3.50 × 0.250.88
Connectivity — avg 4.00 × 0.150.60
Land & Infrastructure — avg 4.50 × 0.200.90
Environment & Climate — avg 3.33 × 0.150.50
Economic & Regulatory — avg 4.40 × 0.251.10
COMPOSITE SCORE3.98 / 5.00 → A
07

16-Factor Scoring Matrix

#FactorTierScoreCategory
1Power AvailabilityB+3.5Power & Grid
2HV Grid ProximityB+3.5Power & Grid
Power & Grid Average3.50× 0.25 = 0.88
3Fiber / ConnectivityA4Connectivity
4Fiber Operators (Validated)A4Connectivity
Connectivity Average4.00× 0.15 = 0.60
5Land & ExpansionS5Land & Infrastructure
6Transport AccessA4Land & Infrastructure
7Zoning / PermittingA4Land & Infrastructure
8Scalability (>200MW)S5Land & Infrastructure
Land & Infrastructure Average4.50× 0.20 = 0.90
9Water / CoolingA4Environment & Climate
10Natural Disaster RiskC2Environment & Climate
11Climate / PUEA4Environment & Climate
Environment & Climate Average3.33× 0.15 = 0.50
12Workforce & TalentS5Economic & Regulatory
13SEZ / Tax IncentivesS5Economic & Regulatory
14Political SupportA4Economic & Regulatory
15Market ProximityA4Economic & Regulatory
16Land CostA4Economic & Regulatory
Economic & Regulatory Average4.40× 0.25 = 1.10
COMPOSITE TOTAL3.98A — PROCEED
08

Location Data

Coordinates51.167883°N, 16.685197°E
Google MapsOpen in Maps →
VoivodeshipDolnośląskie
Grid DSOTauron
Fiber PrimaryHAWE + Atman
Power ConfirmedTBD — Ex-Intel site infrastructure
09

CEE Portfolio Context

CountryTierCapacityStatus
🇵🇱PolandS2 GW+Phase 1 under construction. 20 sites assessed. Stargard (S-tier) primary.
🇷🇴RomaniaA369 MWAvram Iancu — 369MW PV+BESS co-location. Grid-connected. In planning.
🇧🇬BulgariaA1 GWIn planning. Kozloduy nuclear corridor. Strong grid.
🇨🇿Czech RepublicB+200 MWUp next. Prague metro + industrial zones. NIX.CZ IXP.
🇪🇪EstoniaB+100 MWUp next. Tallinn data hub. Cool climate. Nordic connectivity.
🇭🇺HungaryB150 MWBudapest metro. BIX IXP. Paks nuclear proximity. Evaluate.
🇱🇹LithuaniaB100 MWVilnius/Kaunas. LINX node. Baltic interconnection. Evaluate.
🇱🇻Latvia / SlovakiaB–50 MWEarly evaluation. Riga / Bratislava metro areas.
🇭🇷Croatia / SloveniaC50 MWEvaluate. Zagreb / Ljubljana. Limited grid. Emerging markets.
🇷🇸Serbia, BiH, OthersDMonitor only. Regulatory uncertainty. Grid instability.

Strategic Recommendation

PROCEED — Critical Opportunity (Ex-Intel Site)

A-tier MAJOR OPPORTUNITY. 400ha industrial park in LSSE, fully serviced (roads, water, wastewater) — originally prepared for Intel's $4.6B semiconductor fab (cancelled). 245M PLN infrastructure already invested by municipality. Ready for large-scale tenant. Contact LSSE/Miękinia immediately for available plots + grid capacity post-Intel. BUT: confirm grid capacity post-withdrawal + Odra flood risk assessment needed.