← Back to Poland Portfolio
HPC & AI Factory — Land Acquisition Site Analysis

Polkowice / KGHM Belt 200–500 MW

A-tier SLEEPER. KGHM mines = 200-400MW on dedicated 110kV+ substations. Declining operations = available infrastructure. Municipalities desperate for diversification. Best for AI training (latency-tolerant).

Site ID#10
Overall TierA
VoivodeshipDolnośląskie
Grid (DSO)Tauron
Coordinates51.5676°N, 16.0085°E
RecommendationPROCEED — Grid Study + KGHM Partnership
Overall TierA16-Factor Assessment
Power TierS200–500 MW
Fiber TierBHAWE + KGHM
Composite3.75A — Weighted Score

Key Strengths

  • 🔥 KGHM mine grid: 200-400MW on dedicated 110kV+ substations — S-tier power potential
  • Municipalities desperate for post-mining economic diversification
  • HAWE Telekom HQ 40km — dark fiber procurement feasible
  • Cheap post-industrial land — well below metro pricing
  • LSSE SEZ with strong incentives for diversification projects

Key Risks

  • No IXP within 100km — concern for inference workloads
  • Remote location — limited workforce (Polkowice ~20K)
  • KGHM grid access negotiations complex — mining company dynamics
01

Power & Grid Infrastructure

WEIGHT: 25%
1
Power Availability
S
KGHM mines 200-400MW on dedicated 110kV+ substations. Declining operations = S-tier potential.
2
HV Grid Proximity
S
KGHM dedicated 110kV+ substations. Among strongest in portfolio for DC scale.
02

Connectivity & Fiber

WEIGHT: 15%
3
Fiber / Connectivity
B
UPGRADED from C: HAWE 40km + KGHM internal fiber potential. But no IXP within 100km.
4
Fiber Operators (Validated)
B
HAWE 40km, Exatel ring, Tauron OPGW. KGHM internal fiber (undocumented).
03

Land & Infrastructure

WEIGHT: 20%
5
Land & Expansion
A
Post-industrial brownfield available. Large plots near mine infrastructure.
6
Transport Access
B
A2/S3 nearby. Mining roads adequate. Not major motorway junction.
7
Zoning / Permitting
B
Post-industrial brownfield = simpler permitting than greenfield agricultural.
8
Scalability (>200MW)
A
KGHM grid declining = 100s MW available over decade. Large sites scalable.
04

Environment & Climate

WEIGHT: 15%
9
Water / Cooling
B
Mine dewatering systems exist but water quality needs treatment.
10
Natural Disaster Risk
B
Mining-related ground stability concerns. Requires geotech assessment.
11
Climate / PUE
A
Lower Silesian climate. Favorable PUE conditions.
05

Economic & Workforce

WEIGHT: 25%
12
Workforce & Talent
C
Polkowice ~20K. Post-mining workforce available but not DC-trained. Wrocław 100km.
13
SEZ / Tax Incentives
A
LSSE zone. Polish Investment Zone. Strong municipal incentives for diversification.
14
Political Support
B
Strong interest in post-mining diversification. Municipality receptive.
15
Market Proximity
B
Remote from major demand centers. Better for training than inference.
16
Land Cost
S
Post-industrial/rural <€10-20/sqm. Among cheapest in portfolio.
06

Weighted Composite Score

Power & Grid — avg 5.00 × 0.251.25
Connectivity — avg 3.00 × 0.150.45
Land & Infrastructure — avg 3.50 × 0.200.70
Environment & Climate — avg 3.33 × 0.150.50
Economic & Regulatory — avg 3.40 × 0.250.85
COMPOSITE SCORE3.75 / 5.00 → A
07

16-Factor Scoring Matrix

#FactorTierScoreCategory
1Power AvailabilityS5Power & Grid
2HV Grid ProximityS5Power & Grid
Power & Grid Average5.00× 0.25 = 1.25
3Fiber / ConnectivityB3Connectivity
4Fiber Operators (Validated)B3Connectivity
Connectivity Average3.00× 0.15 = 0.45
5Land & ExpansionA4Land & Infrastructure
6Transport AccessB3Land & Infrastructure
7Zoning / PermittingB3Land & Infrastructure
8Scalability (>200MW)A4Land & Infrastructure
Land & Infrastructure Average3.50× 0.20 = 0.70
9Water / CoolingB3Environment & Climate
10Natural Disaster RiskB3Environment & Climate
11Climate / PUEA4Environment & Climate
Environment & Climate Average3.33× 0.15 = 0.50
12Workforce & TalentC2Economic & Regulatory
13SEZ / Tax IncentivesA4Economic & Regulatory
14Political SupportB3Economic & Regulatory
15Market ProximityB3Economic & Regulatory
16Land CostS5Economic & Regulatory
Economic & Regulatory Average3.40× 0.25 = 0.85
COMPOSITE TOTAL3.75A — PROCEED
08

Location Data

Coordinates51.5676°N, 16.0085°E
Google MapsOpen in Maps →
VoivodeshipDolnośląskie
Grid DSOTauron
Fiber PrimaryHAWE + KGHM
Power ConfirmedTBD — KGHM mine infrastructure declining
09

CEE Portfolio Context

CountryTierCapacityStatus
🇵🇱PolandS2 GW+Phase 1 under construction. 20 sites assessed. Stargard (S-tier) primary.
🇷🇴RomaniaA369 MWAvram Iancu — 369MW PV+BESS co-location. Grid-connected. In planning.
🇧🇬BulgariaA1 GWIn planning. Kozloduy nuclear corridor. Strong grid.
🇨🇿Czech RepublicB+200 MWUp next. Prague metro + industrial zones. NIX.CZ IXP.
🇪🇪EstoniaB+100 MWUp next. Tallinn data hub. Cool climate. Nordic connectivity.
🇭🇺HungaryB150 MWBudapest metro. BIX IXP. Paks nuclear proximity. Evaluate.
🇱🇹LithuaniaB100 MWVilnius/Kaunas. LINX node. Baltic interconnection. Evaluate.
🇱🇻Latvia / SlovakiaB–50 MWEarly evaluation. Riga / Bratislava metro areas.
🇭🇷Croatia / SloveniaC50 MWEvaluate. Zagreb / Ljubljana. Limited grid. Emerging markets.
🇷🇸Serbia, BiH, OthersDMonitor only. Regulatory uncertainty. Grid instability.

Strategic Recommendation

PROCEED — Grid Study + KGHM Partnership

A-tier sleeper with S-tier power potential. KGHM copper mines = 200-400MW on dedicated 110kV+ substations — as operations decline, infrastructure becomes available. Municipalities desperate for post-mining diversification. Commission Tauron grid study immediately. HAWE HQ 40km for fiber. Best for AI training workloads (latency-tolerant, no IXP within 100km).