HPC & AI Factory — Land Acquisition Site Analysis

Słupsk Grunwaldzka 30–80 MW

B-tier. Submarine cable landing point (BALTICA) nearby but cables land at coast ~20km north, not in city. 90K population. No local IXP. Interesting for Nordic routes but weak for 160MW AI factory.

Site ID#15
Overall TierB
VoivodeshipPomorskie
Grid (DSO)Energa
Coordinates54.483918°N, 16.991893°E
RecommendationCONDITIONAL — Niche Nordic Play Only
Overall TierB16-Factor Assessment
Power TierB30–80 MW
Fiber TierCExatel + Orange
Composite2.8B — Weighted Score

Key Strengths

  • Near submarine cable landing (BALTICA, Denmark-Poland 2) — Nordic connectivity potential
  • Cool Baltic climate — excellent PUE potential
  • Cheap land — affordable entry point

Key Risks

  • 90K city — limited workforce for DC operations
  • No IXP locally — Thinx Gdańsk ~120km
  • Weak grid capacity — no confirmed HV for DC scale
  • Submarine cables land at coast ~20km north, not in Słupsk directly
01

Power & Grid Infrastructure

WEIGHT: 25%
1
Power Availability
B
Energa grid. No major HV confirmed. Standard city power. Offshore wind connections ~60km at Choczewo.
2
HV Grid Proximity
B
Standard Energa distribution. No confirmed DC-scale substation.
02

Connectivity & Fiber

WEIGHT: 15%
3
Fiber / Connectivity
C
Submarine cables land near coast (~20km north) but backhaul unclear. No IXP within 100km. Municipal broadband not DC-grade.
4
Fiber Operators (Validated)
C
Exatel, Orange. Municipal Cisco network. No dark fiber. Very limited.
03

Land & Infrastructure

WEIGHT: 20%
5
Land & Expansion
C
Urban Słupsk — limited large plots available.
6
Transport Access
B
S6 expressway access. Moderate road connectivity.
7
Zoning / Permitting
C
Urban zoning may need DC-specific adaptation.
8
Scalability (>200MW)
C
Limited by grid, land, and fiber constraints.
04

Environment & Climate

WEIGHT: 15%
9
Water / Cooling
A
Słupia River. Baltic coast proximity. Adequate cooling.
10
Natural Disaster Risk
B
Coastal weather exposure. Generally low seismic risk.
11
Climate / PUE
S
Baltic coast — excellent PUE. ~7°C average. Among best in portfolio.
05

Economic & Workforce

WEIGHT: 25%
12
Workforce & Talent
C
90K city. Limited tech talent. No major university.
13
SEZ / Tax Incentives
A
Polish Investment Zone eligible. Pomeranian SEZ subzone.
14
Political Support
C
No DC relationships. Municipality focused on general development.
15
Market Proximity
C
Remote from major demand centers. Nordic niche only.
16
Land Cost
A
Moderate Pomorskie pricing. Not premium.
06

Weighted Composite Score

Power & Grid — avg 3.00 × 0.250.75
Connectivity — avg 2.00 × 0.150.30
Land & Infrastructure — avg 2.25 × 0.200.45
Environment & Climate — avg 4.00 × 0.150.60
Economic & Regulatory — avg 2.80 × 0.250.70
COMPOSITE SCORE2.8 / 5.00 → B
07

16-Factor Scoring Matrix

#FactorTierScoreCategory
1Power AvailabilityB3Power & Grid
2HV Grid ProximityB3Power & Grid
Power & Grid Average3.00× 0.25 = 0.75
3Fiber / ConnectivityC2Connectivity
4Fiber Operators (Validated)C2Connectivity
Connectivity Average2.00× 0.15 = 0.30
5Land & ExpansionC2Land & Infrastructure
6Transport AccessB3Land & Infrastructure
7Zoning / PermittingC2Land & Infrastructure
8Scalability (>200MW)C2Land & Infrastructure
Land & Infrastructure Average2.25× 0.20 = 0.45
9Water / CoolingA4Environment & Climate
10Natural Disaster RiskB3Environment & Climate
11Climate / PUES5Environment & Climate
Environment & Climate Average4.00× 0.15 = 0.60
12Workforce & TalentC2Economic & Regulatory
13SEZ / Tax IncentivesA4Economic & Regulatory
14Political SupportC2Economic & Regulatory
15Market ProximityC2Economic & Regulatory
16Land CostA4Economic & Regulatory
Economic & Regulatory Average2.80× 0.25 = 0.70
COMPOSITE TOTAL2.8B — CONDITIONAL
08

Location Data

Coordinates54.483918°N, 16.991893°E
Google MapsOpen in Maps →
VoivodeshipPomorskie
Grid DSOEnerga
Fiber PrimaryExatel + Orange
Power ConfirmedTBD — No major HV confirmed
09

CEE Portfolio Context

CountryTierCapacityStatus
🇵🇱PolandS2 GW+Phase 1 under construction. 20 sites assessed. Stargard (S-tier) primary.
🇷🇴RomaniaA369 MWAvram Iancu — 369MW PV+BESS co-location. Grid-connected. In planning.
🇧🇬BulgariaA1 GWIn planning. Kozloduy nuclear corridor. Strong grid.
🇨🇿Czech RepublicB+200 MWUp next. Prague metro + industrial zones. NIX.CZ IXP.
🇪🇪EstoniaB+100 MWUp next. Tallinn data hub. Cool climate. Nordic connectivity.
🇭🇺HungaryB150 MWBudapest metro. BIX IXP. Paks nuclear proximity. Evaluate.
🇱🇹LithuaniaB100 MWVilnius/Kaunas. LINX node. Baltic interconnection. Evaluate.
🇱🇻Latvia / SlovakiaB–50 MWEarly evaluation. Riga / Bratislava metro areas.
🇭🇷Croatia / SloveniaC50 MWEvaluate. Zagreb / Ljubljana. Limited grid. Emerging markets.
🇷🇸Serbia, BiH, OthersDMonitor only. Regulatory uncertainty. Grid instability.

Strategic Recommendation

CONDITIONAL — Niche Nordic Play Only

B-tier overall. Notable as near submarine cable landing point (BALTICA, Denmark-Poland 2) — but cables land at coast ~20km north, not directly in city. 90K population limits workforce. No local IXP (Thinx Gdańsk ~120km). Municipal broadband not DC-grade. Interesting niche play for latency-sensitive Nordic routes only. Not viable for 160MW AI factory.