C-tier. CRITICAL CONCERN: Redzikowo hosts US Navy NSF (Aegis Ashore missile defense). Military base proximity creates security, zoning, and airspace restrictions. Not recommended.
⚠️ Adjacent to US Navy NSF Redzikowo (Aegis Ashore missile defense). Military exclusion zones may prohibit data center development. MUST complete legal/military due diligence before any investment.
| # | Factor | Tier | Score | Category |
|---|---|---|---|---|
| 1 | Power Availability | C | 2 | Power & Grid |
| 2 | HV Grid Proximity | C | 2 | Power & Grid |
| Power & Grid Average | 2.00 | × 0.25 = 0.50 | ||
| 3 | Fiber / Connectivity | C | 2 | Connectivity |
| 4 | Fiber Operators (Validated) | C | 2 | Connectivity |
| Connectivity Average | 2.00 | × 0.15 = 0.30 | ||
| 5 | Land & Expansion | C | 2 | Land & Infrastructure |
| 6 | Transport Access | C | 2 | Land & Infrastructure |
| 7 | Zoning / Permitting | D | 1 | Land & Infrastructure |
| 8 | Scalability (>200MW) | C | 2 | Land & Infrastructure |
| Land & Infrastructure Average | 1.75 | × 0.20 = 0.35 | ||
| 9 | Water / Cooling | B | 3 | Environment & Climate |
| 10 | Natural Disaster Risk | B | 3 | Environment & Climate |
| 11 | Climate / PUE | S | 5 | Environment & Climate |
| Environment & Climate Average | 3.67 | × 0.15 = 0.55 | ||
| 12 | Workforce & Talent | C | 2 | Economic & Regulatory |
| 13 | SEZ / Tax Incentives | B | 3 | Economic & Regulatory |
| 14 | Political Support | D | 1 | Economic & Regulatory |
| 15 | Market Proximity | C | 2 | Economic & Regulatory |
| 16 | Land Cost | A | 4 | Economic & Regulatory |
| Economic & Regulatory Average | 2.40 | × 0.25 = 0.60 | ||
| COMPOSITE TOTAL | 2.3 | C — ⚠️ CONDITIONAL |
| Country | Tier | Capacity | Status | |
|---|---|---|---|---|
| 🇵🇱 | Poland | S | 2 GW+ | Phase 1 under construction. 20 sites assessed. Stargard (S-tier) primary. |
| 🇷🇴 | Romania | A | 369 MW | Avram Iancu — 369MW PV+BESS co-location. Grid-connected. In planning. |
| 🇧🇬 | Bulgaria | A | 1 GW | In planning. Kozloduy nuclear corridor. Strong grid. |
| 🇨🇿 | Czech Republic | B+ | 200 MW | Up next. Prague metro + industrial zones. NIX.CZ IXP. |
| 🇪🇪 | Estonia | B+ | 100 MW | Up next. Tallinn data hub. Cool climate. Nordic connectivity. |
| 🇭🇺 | Hungary | B | 150 MW | Budapest metro. BIX IXP. Paks nuclear proximity. Evaluate. |
| 🇱🇹 | Lithuania | B | 100 MW | Vilnius/Kaunas. LINX node. Baltic interconnection. Evaluate. |
| 🇱🇻 | Latvia / Slovakia | B– | 50 MW | Early evaluation. Riga / Bratislava metro areas. |
| 🇭🇷 | Croatia / Slovenia | C | 50 MW | Evaluate. Zagreb / Ljubljana. Limited grid. Emerging markets. |
| 🇷🇸 | Serbia, BiH, Others | D | — | Monitor only. Regulatory uncertainty. Grid instability. |
⚠️ CONDITIONAL — Military Zone Verification Required
C-tier with CRITICAL military concern. Redzikowo hosts US Navy NSF Aegis Ashore missile defense base. Adjacent land may be restricted by military exclusion zones. MUST verify land availability vs military restrictions before any investment. If land is restricted → DROP immediately. If clear → still C-tier with same fiber/workforce limitations as Słupsk Grunwaldzka.