← Back to Poland Portfolio
HPC & AI Factory — Land Acquisition Site Analysis

Środa Śląska 30–80 MW

B+ with HAWE proximity boost. A4 motorway fiber corridor. HAWE Telekom HQ in Legnica 40km — dark fiber procurement advantage. Needs grid KOS study and flood assessment.

Site ID#3
Overall TierB+
VoivodeshipDolnośląskie
Grid (DSO)Tauron
Coordinates51.0435°N, 16.5863°E
RecommendationCONDITIONAL — Grid Study + Flood Assessment
Overall TierB+16-Factor Assessment
Power TierC30–80 MW
Fiber TierB+HAWE (HQ 40km)
Composite3.1B+ — Weighted Score

Key Strengths

  • HAWE Telekom HQ in Legnica only 40km — dark fiber procurement advantage
  • A4 motorway fiber corridor (Orange, Exatel, HAWE backbone)
  • WRIX Wrocław ~35km + WCSS/PIONIER ~35km
  • Cheap rural land — well below Wrocław metro pricing

Key Risks

  • Weak grid — rural area, no confirmed HV substation capacity for DC scale
  • Rural workforce — limited local talent, dependent on Wrocław commute
  • Odra basin flood risk — requires assessment (though less severe than Opole)
01

Power & Grid Infrastructure

WEIGHT: 25%
1
Power Availability
C
Rural A4 corridor. HV lines cross area but no confirmed substation capacity. Needs KOS study.
2
HV Grid Proximity
B
HV lines present (A4 corridor) but no dedicated substation for DC scale.
02

Connectivity & Fiber

WEIGHT: 15%
3
Fiber / Connectivity
B+
UPGRADED: HAWE HQ Legnica 40km. 4,000km dual-ring backbone. A4 fiber. WRIX 35km.
4
Fiber Operators (Validated)
B+
HAWE HQ 40km, Orange, Tauron OPGW. A4 corridor fiber confirmed.
03

Land & Infrastructure

WEIGHT: 20%
5
Land & Expansion
A
Rural = large cheap plots available. Good expansion potential.
6
Transport Access
B
A4 motorway access. Rural road network adequate.
7
Zoning / Permitting
C
Agricultural land — conversion needed. 6-18 month MPZP timeline.
8
Scalability (>200MW)
B
Land available but grid limits scalability without major investment.
04

Environment & Climate

WEIGHT: 15%
9
Water / Cooling
A
Odra basin — excellent water availability.
10
Natural Disaster Risk
C
Odra basin flood risk present, though less severe than Opole/NW areas.
11
Climate / PUE
A
Central Poland climate. Good PUE potential vs Western Europe.
05

Economic & Workforce

WEIGHT: 25%
12
Workforce & Talent
C
Rural area. Dependent on Wrocław commute (~35km).
13
SEZ / Tax Incentives
A
Polish Investment Zone eligible. LSSE zone accessible.
14
Political Support
C
No established relationships. Rural municipality engagement needed.
15
Market Proximity
A
A4 corridor — DACH gateway via Wrocław. Decent market proximity.
16
Land Cost
S
Rural Lower Silesia <€10-20/sqm. Among cheapest sites in portfolio.
06

Weighted Composite Score

Power & Grid — avg 2.50 × 0.250.62
Connectivity — avg 3.50 × 0.150.53
Land & Infrastructure — avg 3.00 × 0.200.60
Environment & Climate — avg 3.33 × 0.150.50
Economic & Regulatory — avg 3.40 × 0.250.85
COMPOSITE SCORE3.1 / 5.00 → B+
07

16-Factor Scoring Matrix

#FactorTierScoreCategory
1Power AvailabilityC2Power & Grid
2HV Grid ProximityB3Power & Grid
Power & Grid Average2.50× 0.25 = 0.62
3Fiber / ConnectivityB+3.5Connectivity
4Fiber Operators (Validated)B+3.5Connectivity
Connectivity Average3.50× 0.15 = 0.53
5Land & ExpansionA4Land & Infrastructure
6Transport AccessB3Land & Infrastructure
7Zoning / PermittingC2Land & Infrastructure
8Scalability (>200MW)B3Land & Infrastructure
Land & Infrastructure Average3.00× 0.20 = 0.60
9Water / CoolingA4Environment & Climate
10Natural Disaster RiskC2Environment & Climate
11Climate / PUEA4Environment & Climate
Environment & Climate Average3.33× 0.15 = 0.50
12Workforce & TalentC2Economic & Regulatory
13SEZ / Tax IncentivesA4Economic & Regulatory
14Political SupportC2Economic & Regulatory
15Market ProximityA4Economic & Regulatory
16Land CostS5Economic & Regulatory
Economic & Regulatory Average3.40× 0.25 = 0.85
COMPOSITE TOTAL3.1B+ — CONDITIONAL
08

Location Data

Coordinates51.0435°N, 16.5863°E
Google MapsOpen in Maps →
VoivodeshipDolnośląskie
Grid DSOTauron
Fiber PrimaryHAWE (HQ 40km)
Power ConfirmedTBD — Rural A4 corridor
09

CEE Portfolio Context

CountryTierCapacityStatus
🇵🇱PolandS2 GW+Phase 1 under construction. 20 sites assessed. Stargard (S-tier) primary.
🇷🇴RomaniaA369 MWAvram Iancu — 369MW PV+BESS co-location. Grid-connected. In planning.
🇧🇬BulgariaA1 GWIn planning. Kozloduy nuclear corridor. Strong grid.
🇨🇿Czech RepublicB+200 MWUp next. Prague metro + industrial zones. NIX.CZ IXP.
🇪🇪EstoniaB+100 MWUp next. Tallinn data hub. Cool climate. Nordic connectivity.
🇭🇺HungaryB150 MWBudapest metro. BIX IXP. Paks nuclear proximity. Evaluate.
🇱🇹LithuaniaB100 MWVilnius/Kaunas. LINX node. Baltic interconnection. Evaluate.
🇱🇻Latvia / SlovakiaB–50 MWEarly evaluation. Riga / Bratislava metro areas.
🇭🇷Croatia / SloveniaC50 MWEvaluate. Zagreb / Ljubljana. Limited grid. Emerging markets.
🇷🇸Serbia, BiH, OthersDMonitor only. Regulatory uncertainty. Grid instability.

Strategic Recommendation

CONDITIONAL — Grid Study + Flood Assessment

B+ tier with HAWE HQ proximity advantage (Legnica 40km). A4 motorway fiber corridor. Cheap rural land. But needs KOS grid study (weak grid suspected) and Odra basin flood assessment. If both pass → strong B+ expansion candidate. Lower cost alternative to Wrocław metro.