B+ with HAWE proximity boost. A4 motorway fiber corridor. HAWE Telekom HQ in Legnica 40km — dark fiber procurement advantage. Needs grid KOS study and flood assessment.
| # | Factor | Tier | Score | Category |
|---|---|---|---|---|
| 1 | Power Availability | C | 2 | Power & Grid |
| 2 | HV Grid Proximity | B | 3 | Power & Grid |
| Power & Grid Average | 2.50 | × 0.25 = 0.62 | ||
| 3 | Fiber / Connectivity | B+ | 3.5 | Connectivity |
| 4 | Fiber Operators (Validated) | B+ | 3.5 | Connectivity |
| Connectivity Average | 3.50 | × 0.15 = 0.53 | ||
| 5 | Land & Expansion | A | 4 | Land & Infrastructure |
| 6 | Transport Access | B | 3 | Land & Infrastructure |
| 7 | Zoning / Permitting | C | 2 | Land & Infrastructure |
| 8 | Scalability (>200MW) | B | 3 | Land & Infrastructure |
| Land & Infrastructure Average | 3.00 | × 0.20 = 0.60 | ||
| 9 | Water / Cooling | A | 4 | Environment & Climate |
| 10 | Natural Disaster Risk | C | 2 | Environment & Climate |
| 11 | Climate / PUE | A | 4 | Environment & Climate |
| Environment & Climate Average | 3.33 | × 0.15 = 0.50 | ||
| 12 | Workforce & Talent | C | 2 | Economic & Regulatory |
| 13 | SEZ / Tax Incentives | A | 4 | Economic & Regulatory |
| 14 | Political Support | C | 2 | Economic & Regulatory |
| 15 | Market Proximity | A | 4 | Economic & Regulatory |
| 16 | Land Cost | S | 5 | Economic & Regulatory |
| Economic & Regulatory Average | 3.40 | × 0.25 = 0.85 | ||
| COMPOSITE TOTAL | 3.1 | B+ — CONDITIONAL |
| Country | Tier | Capacity | Status | |
|---|---|---|---|---|
| 🇵🇱 | Poland | S | 2 GW+ | Phase 1 under construction. 20 sites assessed. Stargard (S-tier) primary. |
| 🇷🇴 | Romania | A | 369 MW | Avram Iancu — 369MW PV+BESS co-location. Grid-connected. In planning. |
| 🇧🇬 | Bulgaria | A | 1 GW | In planning. Kozloduy nuclear corridor. Strong grid. |
| 🇨🇿 | Czech Republic | B+ | 200 MW | Up next. Prague metro + industrial zones. NIX.CZ IXP. |
| 🇪🇪 | Estonia | B+ | 100 MW | Up next. Tallinn data hub. Cool climate. Nordic connectivity. |
| 🇭🇺 | Hungary | B | 150 MW | Budapest metro. BIX IXP. Paks nuclear proximity. Evaluate. |
| 🇱🇹 | Lithuania | B | 100 MW | Vilnius/Kaunas. LINX node. Baltic interconnection. Evaluate. |
| 🇱🇻 | Latvia / Slovakia | B– | 50 MW | Early evaluation. Riga / Bratislava metro areas. |
| 🇭🇷 | Croatia / Slovenia | C | 50 MW | Evaluate. Zagreb / Ljubljana. Limited grid. Emerging markets. |
| 🇷🇸 | Serbia, BiH, Others | D | — | Monitor only. Regulatory uncertainty. Grid instability. |
CONDITIONAL — Grid Study + Flood Assessment
B+ tier with HAWE HQ proximity advantage (Legnica 40km). A4 motorway fiber corridor. Cheap rural land. But needs KOS grid study (weak grid suspected) and Odra basin flood assessment. If both pass → strong B+ expansion candidate. Lower cost alternative to Wrocław metro.